Services

What's the Process of Working With Us

Every AG Developers project follows the same three-step process designed so you always know what comes next, what it costs, and who’s responsible. You deal with one licensed general contractor from the first walk-through to the final inspection. No handoffs, no surprise charges, no coordinating between trades.

DADU / ADU

Build a detached or attached accessory dwelling unit for rental income, aging parents, a home office, or a guest suite. We verify parcel eligibility under zoning ordinances and overlay districts, then handle full design, permitting, and construction. Starting at $100,000.

Attic Conversions

Turn your walk-up attic or shell into a bonus room, primary suite, home office, or media space. We utilize the convertible space your builder already framed for you. Starting at $50,000.

Licensed TN GC #76500

Every project permitted in our name, fully code-complaint, never subcontracted out.

Fixed-Price Quotes

A detailed written proposal with a real number, not a vague "range" that doubles by the end of the job.

One Point of Contact

Aaron personally oversees every project from first site visit to final walkthrough.

Clear Communication

Regular updates and honest answers at every stage of your build.

Basement Finishing

Convert an unfinished daylight or walk-out basement into a full second living area, theater room, guest suite, wet bar, home gym, or a legal ADU with separate entry. We handle moisture management, egress, insulation, and all mechanical rough-ins as part of the build. Starting at $50,000.

Answer frequently asked questions

1. Can I convert my attic if I only have pull-down stairs?

Possibly — but a walk-up staircase is the single best indicator of conversion potential. If you have pull-down stairs, we can often retrofit a permanent staircase as part of the conversion, though this adds to the project scope. We’ll walk through the feasibility during your free consultation.

2. Do you work on homes outside Williamson County?

Yes. Our primary service area is Franklin, Brentwood, Nashville, Mt. Juliet, and Hendersonville, but we take on projects across Middle Tennessee. ADU eligibility and permitting process differ by municipality — we verify parcel-specific rules before quoting.

3. How long does an average conversion take?

Most attic, basement, or garage conversions run 8–14 weeks from permit issuance to final walkthrough. ADU additions typically run 4–6 months. We give you a firm timeline in your fixed-price proposal — not a vague range.

Showcase a list of Blog Posts

Sample Title
Read More
Sample Title
Read More
Sample Title
Read More

Not Sure Which Service Fits Your Home?

That’s what the free consultation is for. We’ll walk the space, ask what you want out of it, and tell you honestly whether an attic conversion, basement finish, garage conversion, or new ADU addition is the right move — or whether none of them are.